All questions

Laboratory Quality Control Practice Test

Browse all practice questions for the Laboratory Quality Control Practice Test. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

Laboratory Quality Control Practice Test course image
All questions

These questions are part of the practice quiz. Start practicing

  • Which statement differentiates random error from systematic error?
  • Which option is a core element of QC planning for immunoassays?
  • What percent of a normal population is encompassed by a reference range defined as Mean ±2SD?
  • On a Levey-Jennings plot, dispersion refers to what pattern?
  • What is change control, and how does it apply to QC methods or instruments?
  • Which term describes the ability to hit the same spot in repeated measurements?
  • Variance between the measured and true values.
  • Which term describes the factors that affect the measurement of an analyte?
  • Which statement about external quality assessment (EQA) is accurate?
  • If a lab consistently performs below the group mean in proficiency testing, what action is recommended?
  • How would you document a failed instrument downtime that could impact test accuracy?
  • How often should internal audits be conducted and what do they typically review?
  • Certified Reference Materials (CRMs) are used to...
  • Interpret a run where two control measurements are outside the 1-2s rule but within the 4-1s rule.
  • Given a control result of 105, an expected mean of 100, and a standard deviation of 4 for the control material, what is the Z-score?
  • Why is participation in external quality assessment (EQA) included in QC design?
  • If a control mean is 200 and SD is 10, which Z-score corresponds to a result of 180?
  • What is the primary objective of Six Sigma?
  • When QC results indicate a problem, which action must be documented?
  • How is a quality control plan best defined?
  • Why are internal QC materials selected with known concentrations near medical decision levels?
  • What expresses variability as a percent of the mean?
  • Which statement best describes proficiency testing in relation to method comparison?
  • Calculate the Z-score for X = 105, μ = 100, σ = 5.
  • Which quality control material should simulate real patient specimens and span the clinically important analytical range?
  • External quality assessment (EQA) results are used to:
  • A preventive maintenance plan for a common laboratory analyzer should include which elements?
  • What is the purpose of Westgard rules in laboratory QC?
  • Provide an example of a scenario where a single control rule violation is treated differently from multiple consecutive violations.
  • What is a key benefit of training and competency assessment in sustaining QC quality?
  • Which metric expresses defects per million opportunities in Six Sigma?
  • Which plot is used to monitor systematic QC performance across time?
  • On a QC chart, which option describes the measurement displayed on the plot?
  • In DMAIC, which phase defines the project purpose and scope?
  • What is required in method comparison studies to validate a new assay against a reference method?
  • Which set of terms correctly represents the '+ attributes' of ALCOA+ data integrity?
  • Six Sigma aims to reduce defects to how many defects per million opportunities?
  • What are the key components of a control chart?
  • What is the purpose of a control chart in QC?
  • Why should QC materials span the clinically important analytical range?
  • Define CAPA and describe its typical lifecycle in a laboratory quality program.
  • What is the purpose of corrective action in QC and how is effectiveness verified?
  • Reference Range is typically derived from measurements in which population?
  • Which document describes the processes used for testing in a QC program?
  • Which statement best defines a nonconforming event vs a corrective action?
  • Which statement best describes the 2(2s) Westgard Rule?
  • What does cusum indicate when control data are randomly scattered about the expected mean?
  • With mean 100 and SD 5, a result of 110 yields Z = 2. Which statement is true?
  • Which statistic is the square root of the variance?
  • Baseline data in quality improvement refers to which of the following?
  • What does a Z-score represent?
  • If the control result equals the control mean, the Z-score is
  • What is the purpose of external quality assessment (EQA) participation in QC?
  • Six Sigma is associated with reducing variation by using how many standard deviations from the mean?
  • Traceability in calibration is established by...
  • If a control chart displays a point outside the control limits, what is the appropriate action?
  • Which action is part of change control when updating QC methods?
  • Which Westgard rule requires 10 consecutive control measurements to fall on one side of the mean?
  • On a Levey-Jennings Chart, what is the typical acceptable range for control values?
  • What constitutes a nonconforming result and how should it be handled?
  • Under CLIA QC requirements, how many levels of control materials should be used each day?
  • What is also known as Standard Deviation Index or SDI?
  • DMAIC stands for Define, Measure, Analyze, Improve, Control.
  • A QC plan for a new method should include which items?
  • Which statement best describes what a Levey-Jennings plot displays?
  • Which ALCOA+ attribute ensures data are contemporaneous?
  • The event "One control value exceeds the mean ±3SD" corresponds to which Westgard rule?
  • How does proficiency testing influence method comparison and improvement in laboratory QC?
  • The Cusum plot is defined as what?
  • Progressive drift of reported values from a prior mean is best described as which term?
  • Which Westgard rule acts as a warning rule to trigger careful inspection of the following control results?
  • What is center line drift on a QC control chart?
  • What is a primary purpose of an Analytical Run?
  • Which Westgard rule is commonly considered a warning when a single control measurement exceeds the 2 standard deviation limit?
  • The 1(3s) Westgard Rule is triggered by:
  • Which statement best describes calibration, verification, and validation in a QC program?
  • Which term is commonly used interchangeably with Reference Interval?
  • Which option correctly states the acronym DMAIC?
  • Which statement describes the behavior of a cusum when there is a systematic error?
  • Why is data integrity (ALCOA+) critical in QC reporting?
  • Which error exists in all measurements and is due to chance?
  • How do blank control and negative/positive controls differ in QC?
  • Which term describes six consecutive measurements rising or falling and may cross the mean?
  • Which factor is not typically considered when designing a QC plan for a new analytical method?
  • What measures ensure traceability of reagents and calibrators in QC?
  • In a quality control program, how often should calibration procedures be performed?
  • Which condition is indicated by six consecutive points on one side of the mean?
  • Which statement about the effect of changing the standard deviation on Z-score for a fixed difference is true?
  • What does proficiency testing measure?
  • What best differentiates calibration traceability from instrument traceability?
  • Which guideline is commonly followed in laboratory testing procedures and instrument operation?
  • Which statement describes the recommended minimum population size from the local community when establishing a reference range?
  • In DMAIC, which phase implements improvements?
  • In a quality control program, what constitutes a proper nonconformance investigation following a failed result during downtime?
  • In DMAIC, which phase collects baseline data on current processes and identifies problems?
  • Which term represents the mathematical average of the data set?
  • Which term is the middle value when the data are ordered?
  • Which of the following statements describes the Z-score's role in quality control?
  • The Waning rule to trigger careful inspection of the following control results corresponds to which Westgard rule?
  • Which error is primarily associated with human actions during laboratory testing, such as specimen handling and data entry?
  • Which term describes the difference between the measured value and the true value?
  • In immunohematology QC records, how long are records retained?
  • Which material must be tested in exactly the same manner as patient specimens to ensure proper QC?
  • Which statement is true about a Z-score of 3?
  • Which type of error can arise from human actions during testing, such as specimen handling and data entry?
  • In assay performance, differentiate LOD and LOQ.
  • What term describes the ability to achieve accuracy and precision simultaneously?
  • Levey-Jennings Charts show the relationship of control limits to which distribution type?
  • Which term describes the factors that affect the measurement of an analyte?
  • Which term is the value that occurs most frequently?
  • PDCA cycle stands for what in QC improvement?
  • What does ALCOA+ stand for in data integrity and why is it important in the lab?
  • What is a quality indicator (QI) and how is it used in continuous quality improvement?
  • Why is recording maintenance activities important for QC?
  • After a reagent lot change, which action is appropriate?
  • Accuracy in QC, defined as closeness to the true value, is described as which term?
  • Westgard Rules measurements per run are generally used with how many control measurements per run?
  • Which three items are essential components of a Laboratory Quality Management System (LQMS)?
  • Which term labels the concept of testing controls at multiple levels such as Low, Medium, and High?
  • How is bias assessed in proficiency testing, and what does it inform?
  • During method validation, which term describes the closeness of the mean to the true value?
  • Which quality improvement process is aimed at identifying and removing causes of defects?
  • Which Westgard rule is described by two consecutive control values where the first exceeds the mean +2SD and the following exceeds the mean −2SD?
  • If the difference between result and mean is 6 and the SD is 2, what is the Z-score?
  • What distinguishes run acceptance criteria from lot acceptance criteria in QC?
  • Which distribution best describes control values in a quality control program?
  • What is dispersion of repeated results about the mean?
  • In the CAPA lifecycle, which statement best describes the documentation requirement?
  • Which Westgard rule is violated when two consecutive control values exceed the mean ±2SD?
  • Which statement is true when a Z-score equals 3?
  • Which term describes the closeness of repeated results (reproducibility)?
  • Levey-Jennings Chart is used to plot which data set?
  • Which type of error is related to the organization or design of a laboratory?
  • Which statistic is expressed as a percentage and describes variability?
  • What is the primary purpose of control materials in QC?
  • Pre-analytical factors that can impact QC results include which of the following?
  • Which type of error occurs at the interface between a laboratorian and the patient samples?
  • Which error influences values consistently in one direction?
  • What is the primary reason to retain QC data and maintain audit trails?
  • With mean 100 and SD 5, a result of 85 yields Z = -3. Which statement is true?
  • Who should have access to QC audit trails?
  • What percentage of values lie within 2 standard deviations of the mean in a normal distribution?
  • Which term means how close the value is to the true value ( bulls-eye )?
  • What term describes the combination of decision criteria used to decide whether an analytical run is in-control or out-of-control?
  • Which element is essential for proper sample labeling and chain of custody?
  • In Six Sigma, the Analyze phase uses data to identify cause-effect relationships.
  • Which concept is demonstrated by the Levey-Jennings Chart?
  • A group of specimens analyzed and reported together is called what?
  • If a control mean is 100 and SD is 5, a result of 95 yields Z = (95-100)/5 = -1. Which statement is true?
  • Westgard rules are generally applied when the number of control measurements per run is:
  • What is external quality assessment (EQA) and how does it differ from proficiency testing?
  • Which Westgard rule is triggered by a single control value exceeding the mean by more than 2 standard deviations?
  • What is the effect of increasing the mean while keeping SD constant on the Z-score for a fixed observed result?
  • What is the primary use of a Shewhart control chart in monitoring instrument performance?
  • What term describes the range that controls should fall within to ensure accuracy (Mean ± 2SD)?
  • Describe the cycle of proficiency testing and how laboratories use results to improve.
  • Which statement about Z-score is true?
  • What is the first step when you observe drift in a control value over several days?
  • Which statistic is the square root of the variance?
  • Differentiate internal quality control from external quality control in a clinical lab.
  • Which document records traceability to standards?
  • When a reagent lot changes, what is a recommended approach?
  • What is the standard retention period for QC records?
  • What is the primary purpose of ISO 15189 in clinical laboratories?
  • What does CAPA stand for in QC practice, and why is it important?
  • How are internal QC control materials selected and what acceptance criteria are typically used?
  • In QC results, which binary classification is commonly used?
  • An abrupt change from the established mean on a QC chart is called what?
  • What is a primary responsibility of the quality manager in the laboratory QC program?
  • Which plot is used to display control results on the Y-axis against time on the X-axis?
  • Dynamic range defines which of the following?
  • Which regulation mandates quality control in clinical laboratories in the United States?
  • What is the standard deviation abbreviated as?
  • What are typical elements of an internal audit review?
  • In a Levey-Jennings plot, which statement is true about axes?
  • In DMAIC, which phase investigates root causes and validates root causes against captured data?
  • In DMAIC, which phase monitors the system after changes to ensure gains are sustained?
  • Which item is NOT typically included in a quality control plan?
  • Linearity and dynamic range define method applicability. Which statement is correct?
  • Which Westgard rule is violated when ten consecutive control measurements fall on one side of the mean?
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy